This was taken today, April 22. We’re still rocking and rolling in Haywire and the Stomping Grounds, with a full jump line and a whole mess of rails. Skybound and Sidewinder are both done for the season, but the Superpipe and Minipipe are both open in full springtime excellence.
Our plan for parks for the rest of the season will be to keep Stomping Grounds and Haywire up and running right until the bitter end. So as long as the mountain is open, you’ll have a park to shred.

This was taken today, April 22. We’re still rocking and rolling in Haywire and the Stomping Grounds, with a full jump line and a whole mess of rails. Skybound and Sidewinder are both done for the season, but the Superpipe and Minipipe are both open in full springtime excellence.

Our plan for parks for the rest of the season will be to keep Stomping Grounds and Haywire up and running right until the bitter end. So as long as the mountain is open, you’ll have a park to shred.

  1. sugarloafterrainparks posted this
Blog comments powered by Disqus